翻訳と辞書
Words near each other
・ "O" Is for Outlaw
・ "O"-Jung.Ban.Hap.
・ "Ode-to-Napoleon" hexachord
・ "Oh Yeah!" Live
・ "Our Contemporary" regional art exhibition (Leningrad, 1975)
・ "P" Is for Peril
・ "Pimpernel" Smith
・ "Polish death camp" controversy
・ "Pro knigi" ("About books")
・ "Prosopa" Greek Television Awards
・ "Pussy Cats" Starring the Walkmen
・ "Q" Is for Quarry
・ "R" Is for Ricochet
・ "R" The King (2016 film)
・ "Rags" Ragland
・ ! (album)
・ ! (disambiguation)
・ !!
・ !!!
・ !!! (album)
・ !!Destroy-Oh-Boy!!
・ !Action Pact!
・ !Arriba! La Pachanga
・ !Hero
・ !Hero (album)
・ !Kung language
・ !Oka Tokat
・ !PAUS3
・ !T.O.O.H.!
・ !Women Art Revolution


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Metrô Rio : ウィキペディア英語版
Rio de Janeiro Metro

The Rio de Janeiro Metro (Portuguese: ''Metrô Rio'' , commonly referred to as just the ''Metrô'' (:Meˈtɾo)) in Rio, is a mass-transit underground railway network that serves the city of Rio de Janeiro, Brazil. The Metrô was inaugurated on March 5, 1979, with five stations operating on one line.〔(【引用サイトリンク】title=History - How it all began )〕 The system now covers a total of , serving 35 stations, divided into two lines: Line 1 () and Line 2 (),〔 which together travel over a shared stretch of line that covers 10 stations〔(【引用サイトリンク】title=Maps )〕 and an approximate distance of 5 kilometers. Metrô Rio has the second highest passenger volume of the metro systems in Brazil, after the São Paulo Metro.
The system currently consists of two lines.〔 Line 1 (orange line) serves downtown Rio, tourist areas in the South Zone, and several neighbourhoods in the North Zone. It is a semicircular line, and is fully underground. It runs from Uruguai Station to Ipanema/General Osório Station. Line 2 (green line) serves working-class residential neighborhoods extending toward the north. It is a northwest-to-southeast line, and almost completely above-ground (mostly at grade and partly elevated). This line started as a light rail, but due to increasing numbers of commuters, it gradually changed to rapid transit or metro. Because of its origin as light rail, it is at grade except for Estácio Station (the former connection station between lines 1 and 2), which is underground and Cidade Nova Station, which is elevated.
The Government of the State of Rio de Janeiro remains responsible for the expansion of the metro network, through Rio Trilhos. In late December 2007, the lease was renewed until 2038 and Metrô Rio assumed responsibility for the construction of Cidade Nova Station , which serves as a link between Line 2 and Line 1 ending the need to transfer stations, with the purchase of 114 cars, and construction of Uruguai Station, extending Line 1 further north.
The extension works of Line 2, called Line 1A, which ended the need for a transfer at Estácio Station and allowed the direct connection from Pavuna Station to Botafogo were started by Metrô Rio on November 13, 2008 and the tracks were completed in December 2009. With the extension, the 250 thousand passengers that circulate daily on Line 2 do not need to change trains any more in order to get to the South Zone. The interconnection of the two metro lines will reduce, by up to 13 minutes, the journey time from Pavuna station to the city's downtown, the destination of 83% of Line 2's passengers.
==History==

Rio de Janeiro is the second largest city of Brazil and the most important tourist attraction of the country. After 1950, the number of motor vehicles on the roads increased dramatically. Rio de Janeiro lies in a hilly region, between the mountains and the Atlantic Ocean. The landscape of the city is extremely uneven, making travelling by car or bus a very time-consuming task through the narrow streets, which were ideal for trams but not for the increasing traffic of motor vehicles. By the early 1960s, traffic jams, pollution, and smog had become a serious problem in the city. To overcome these problems, local transport authorities decided to greatly reduce the tram network and switch over to a metro network.
On December 14, 1968, the Companhia do Metropolitano do Rio de Janeiro (Metro Company of Rio de Janeiro in English) was created by State Law number 1736. In March 1975, with Law–Decree number 25, the company effectively came into existence. On June 23, 1970, construction work started in Jardim da Glória. From 1971 to 1974, owing to a lack of resources, construction work stopped and was only resumed a year later. The Rio de Janeiro Metro began operating in March 1979, during the administration of governor Chagas Freitas. In the beginning, there were only five stations: Praça Onze, Central, Presidente Vargas, Cinelândia Station, and Glória Station, operating from 9:00 AM to 3:00 PM.
In the first 10 days, the system transported more than half a million people, averaging sixty thousand passengers per day. At that time, the subway worked with only four trains of four cars each, with an average interval of eight minutes. In December of the same year, the operating schedule was extended until 11:00 PM, including Saturdays. In 1980, the metro system began to be expanded with the opening of Uruguaiana Station and Estácio stations. The two new stations caused larger passenger demand, compelling an increase in the number of trains from four to six.
The Carioca station in Downtown Rio de Janeiro, the busiest station with more than eighty thousand passengers a day, was finished in January 1981. By the end of the same year, the stations Catete Station, Morro Azul (now called Flamengo Station), and Botafogo Station were completed. In November 1981, Line 2 (or Linha 2 in Portuguese) started operating with only two stations: São Cristóvão and Maracanã Station (which serves the Maracanã football stadium). In December, completing the southern section of the first Line 1, Largo do Machado Station began service. In 1982, the complementary inaugurations of the northern section of Line 1 started, with the beginning of operations of the Afonso Pena, São Francisco Xavier and Saens Peña stations.
To allow the completion of the second line to Irajá, in 1983, the trains on this line began operating from 6:00 AM to 2:00 PM. After a month, this schedule was extended until 8 PM, and a free bus service was established, integrating the Estácio, São Cristóvão, and Maracanã stations. After the conclusion of the works, the Pre-Metro and Maria da Graça, Del Castilho, Inhaúma Station and Irajá Station stations were opened. In 1984 the commercial operation of the second line began with five trains on workdays with a five-and-a-half-minute interval during the week.
Following the expansion, the Triagem station was inaugurated in July 1988, the year of the creation of the subway/train integration ticket. In 1991, the Engenho da Rainha station was inaugurated. From 1991 to 1996, two stations were opened, Thomaz Coelho and Vicente de Carvalho. In this period, the time interval of the nine stations of the second line was reduced to six minutes. In July 1998, Cardeal Arcoverde Station, in the traditional neighbourhood of Copacabana, was inaugurated. Five more stations became operational in the following two months: Irajá Station, Colégio Station, Coelho Neto, Engenheiro Rubens Paiva, Acari/Fazenda Botafogo and Pavuna Station.
In 1997, the Carnival Operation (Operação de Carnaval in Portuguese) began with continuous service during the Rio Carnival festivity days. In December of that year the system was privatised and the management and operation of the company passed into the hands of the Consortium Opportrans with a concession of 20 years, leaving the responsibility for expansion of the network in the hands of the state government of Rio de Janeiro through the company Rio Trilhos. The Rio Reveillón is highlighted by the performance of Opportrans that since 1999 has conducted a Special Operation to ensure a party for all. Tickets illustrated scheduled appointments to avoid overcrowding and provide the best service.
In 2003 Siqueira Campos Station in Copacabana was inaugurated. Cantagalo Station beyond Siqueira Campos was due to be completed in March 2006 but owing to financial problems the opening date was postponed to December 15. This was again postponed and the final opening took place in February 2007. At the same time construction began on the subway extension to General Osório station in Ipanema. This was opened in December 2009.
In late December 2007, Metro Rio renewed the concession, then defined as for another 20 years, to 2038.
Line 1A from Pavuna to Botafogo opened in December 2009 with a connection between São Cristóvão and Central. Passenger traffic at Estácio is reduced and the elimination of the need to transfer between Lines 1 and 2 saves up to 13 minutes of journey time. A new station on the new section, Cidade Nova, was opened in November 2010; the station is on Avenida Presidente Vargas and serves the City Hall.
In June 2010, the construction of Line 4 began, linking Ipanema to Barra da Tijuca, where most 2016 Olympic Games events will occur.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Rio de Janeiro Metro」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.